Chapel Updates

We are excited to announce that the Chapel has just undergone a makeover which includes:

  • New Carpet
  • New Chairs
  • New ROOF
  • Upgraded Lighting
  • New Sound Booth Location for Expanded Chapel Space

Looking Good!

IMG_1208
Chapel Stage 2023
IMG_1158
Chapel 2023 Side Stage Back
IMG_1195

Before & After

Before Labled Chapel 1
Labeled Chapel New

New Sound Booth

The window is a cutout with no glass. The new entry is from the back side of the Chapel and then directly behind the counter. Some technology is upgraded but similar. See the regular Chapel Page for technology details.

Tech Updates:

  • New sound board with 16 channels (see pic)
  • Screen roll-down switch is now located within new sound booth.
  • Room and stage light switches are located in new sound booth
  • New LED Light board (see pic)

 

IMG_1218
IMG_7984
IMG_1208
IMG_6477 2
IMG_6472
Sound Booth Labels Switches

Hallway and Entry

The new hallway sits "outside" under the overhang. This was added so that there is still a double-door option for sound, light and temperature control. The inner hallway could not be split with a double-door due to the floor slope.

An outdoor overhang has also been added.

Chapel Overhand and new hallway
image4 2
image3
image2 2
IMG_1193

Chapel Roof: Before and After

Chapel Roof Before
Chapel Roof After

Other Notes

  • Break Out Rooms at Back of Chapel:
    • Maple Room: no changes
    • Alder Room: Smaller because of new sound booth. If not all chairs are used, this will be chair storage.